2001 - today
- 2017
Opening of the Institute of Radiology in the immediate vicinity of the hospital. The Institute has an MRI and CT scanner as well as conventional X-ray equipment.
Renovation of the basement: A modern physio room is created. The new floating treadmill will be used from April.
- 2008
30th anniversary of Klinik Permanence
- 2007
Opening of the Bern Knee Surgery Centre at Klinik Permanence
- 2003
Conversion and renovation of Klinik Permanence, commissioning of the two new, state-of-the-art operating theatres, further patient rooms, extension of interdisciplinary consultation hours
- 2001
Relocation of the project to the newly acquired Salem-Spital and reorientation of Klinik Permanence
1991 - 2000
- 2000
Initiation of the major project “Orthopaedic Centre Bern”
- 1997
Integration of Klinik Permanence into the Hirslanden Private Hospital Group and opening of the Surgical Ophthalmology Centre
- 1992
Hospital extension to include a third operating theatre, opening of further patient rooms and offices
1978 - 1990
- 1985/86
Opening of a second operating theatre, further patient rooms, doctors’ practices, an imaging room and an X-ray archive
- 1980
Clinic extension: additional patient rooms, on-call rooms, physiotherapy and laundry room
- 1978
Opening of Klinik Permanence with 26 beds, an operating theatre and an outpatient clinic as well as a 24-hour emergency ward
On this page will find an overview of the history and milestones of the Bern Hirslanden hospitals Beau-Site, Permanence and Salem-Spital.
Start of the renovation of Klinik Beau-Site to optimise the use of space in order to strengthen specialities such as cardiovascular, vascular and abdominal medicine and to pool outpatient processes.
- Opening of the Centre for Urology and Nephrology
- Installation of the da Vinci medical robot.
- Opening of the Institute of Radiology close to the hospital. The institute has an MRI and CT scanner, as well as conventional X-ray equipment.
- Conversion of the basement floor to create a modern physiotherapy area. The new anti-gravity treadmill will be in use from April.
Klinik Beau-Site celebrates its 70th anniversary. The video for the hospital’s 70th anniversary presents a series of the most important milestones.
- Opening of a fourth delivery room
- Refurbishment of reception area
- Refurbishment of patient administration
- Construction of a public pharmacy
Klinik Beau-Site is the only hospital besides the Inselspital to be awarded a service mandate for large, rare visceral surgery interventions by the Conference of Cantonal Health Directors (GDK).
Construction of a third, fully digitalised heart catheter laboratory specialised in the treatment of patients with cardiac arrhythmia.
Installation of a new magnetic resonance imaging (MRI) scanner
- Opening of the modern medical and inpatient ward (Home von Rodt)
- Expansion of the intensive care unit (ICU), day clinic and the intermediate care unit (IMC)
Refurbishment of inpatient rooms
Start of construction of a new medical and inpatient ward on the hospital site
Salem-Spital celebrates its 120th anniversary
Klinik Permanence celebrates its 30th anniversary
Opening of the Knee Surgery Bern centre at the Klinik Permanence site
- Refurbishment of ward A5 for patients with private and semi-private insurance
- Refurbishment of the dialysis unit
Opening of the Lung Centre Bern
Restructuring of the 24-hour cardiac emergency unit. Collaboration with Salem-Spital emergency centre.
Opening of the Hirslanden Bern Emergency Centre
Opening of the Orthopaedic Clinic Bern
Refurbishment and renovation of Klinik Permanence, opening of two new, state-of-the-art operating rooms, additional patient rooms, expansion of interdisciplinary consultation services
Integration of Salem-Spital into the Hirslanden private hospital group
Completion of refurbishment with additional second and third basement levels worth 27 million Swiss francs.
Refurbishment of the maternity ward
Project relocation to the newly acquired Salem-Spital and realignment of Klinik Permanence
Launch of the major ‘Orthopaedic Centre Bern’ project
Expansion of physiotherapy and medical training therapy (MTT)
Integration of Klinik Permanence into the Hirslanden private hospital group and opening of the Eye Surgery Centre
Second phase of construction and refurbishment, including construction of the surgical centre
Expansion of the hospital to include a third operating room, plus opening of additional patient rooms and offices
Merger with the Hirslanden private hospital group
The refurbishment of the entire hospital area is completed, with the addition of the heart catheter laboratory and cardiac surgery
Opening of a second operating room, additional patient rooms, medical practices, an image processing room and an X-ray archive
Acquisition by the AMI private hospital group
First extensive refurbishment and construction phase of the entire hospital
Hospital extension: additional patient rooms, on-call rooms, physiotherapy and laundry room
Opening of Klinik Permanence with 26 beds, an operating room, an outpatient ward and a 24-hour emergency department
Addition of the building at Schänzlihalde 15 to the site
Built around 1911 as a hotel, Beau-Site was bought by Dr Werner Raaflaub and two other doctors and converted into a hospital.
Further expansions of the hospital building
Construction of the wing south-east of the existing main building (Building B)
Opening of Salem-Spital, built by Friedrich Dändliker
Klinik Beau-Site celebrates its 80th anniversary.