History and milestones of the Hirslanden Klinik Im Park
2017 - 2010
2017
- Reconstruction and opening of the Operationszentrum Bellaria
2016
- 30th anniversary of Klinik Im Park
- Opening of Ortho Clinic Zurich
- Opening of the new emergency department
2015
- Opening of FussInstitut Zurich
- Opening of Swiss Scoliosis – Centre for Spinal and Scoliosis Surgery
- Opening of the provisional emergency department
2014
- November sees the opening of the hybrid operating room in Klinik Im Park
- Modernisation of CT and Mammography at Radiology and Neuroradiology Zurich, Schanze location
- Opening of Vascular Centre Im Park
2013
- Modernisation of CT and Mammography at Radiology and Neuroradiology Zurich, Klinik Im Park location
2012
- Opening of the new maternity unit
- Opening of the Surgical Centre Zurich (visceral, thoracic, specialised tumour surgery)
- Reopening of LungenZentrum Im Park
2010
- Opening of the new 8-bed ICU
2010 - 2000
2009/2010
- Renovation of Radiology with a new MRI and mammography machine
2008
- May sees the opening of the hospital's third cardiac catheterisation laboratory. This ultra-modern medical infrastructure enables high-precision, gentle vascular treatments with reduced exposure to radiation and shorter surgical procedures.
- Oncology Centre Zurich moves to new building
- Opening of the Centre for Emergency Surgery
- Opening of the Centre for Haematology
- Opening of the Orthopaedic Centre Zurich
2007
- Opening of the faceclinic, a facility open to all patients suffering from functional and/or aesthetic problems in the facial area
- Opening of the Centre for Gastroenterology and Hepatology
2006
- The cardiac catheterisation laboratory is extended to include a biplane cardiac catheterisation line
- Opening of the public training centre "imparktraining"
- Reopening and expansion of the Dialysis Centre
2005
- The summer sees the replacement of equipment at our institutes at Klinik Im Park and Schanze. New MRI and CT machines installed in both institutes.
- Renovation of the patient rooms on the 2nd and 3rd floors and in the maternity unit
- Small play area set up on the 3rd floor for our little visitors
2004
- New skywalk for emergency entrance
- Increase in number of beds with monitoring
- Re-equipment of the cardiac catheter laboratory
- Activation of the baby gallery
- Hospital renovation of the patient rooms on the ground floor and first floor
2003
- Expansion of cardiology with diagnostic and therapeutic electrophysiology (EPS)/radiofrequency ablation (RFA)
2002
- Installation of a second cardiac catheterisation laboratory
- Opening of HerzGefässZentrum Zürich
2001
- Opening of the Centre for Maxillofacial Surgery
- Renovation of the Neuroradiological and Radiological Institutes of Schanze as well as the expansion of the range of radiological services
- Reconstruction of the central sterilisation unit
2000
- Opening of the Centre for Hand Surgery
1999 - 1990
1999
- Opening of the day hospital in "Bellaria House"
- Opening of the dialysis ward
1996
- Redesign of the maternity ward
1994
- Opening of the first Gamma Knife Centre in Switzerland and the Oncology Centre
- Reconstruction of the outpatient clinic
1993
- Opening of the cardiac catheterisation laboratory
1991
- Upgrading of the MRI scanner and expansion of the radiological team from two to four doctors
1990
- Merger of the Hirslanden Klinik with four hospitals to create the first private hospital group in Switzerland. Inclusion of Klinik Im Park in the Hirslanden Group.
1989 - 1986
1988
- Opening of the outpatient clinic
1986
- Opening of AMI Klinik Im Park (American Medical International Inc.)